Panel upgrades and EV chargers

Licensed electricians for older Sacramento homes. We pull the permit, book the inspection and leave the walls clean.

Electrician using a drill on a breaker panel
Licensed C-10 contractor Permits pulled for you Arrival window of 2 hours EV chargers installed Older homes welcome

The three jobs we do most

Electrician working on an open breaker panel

Panel upgrades

100 amp to 200 amp, so a heat pump and a charger can run at once.

Electrician inspecting an electrical panel

EV chargers

Level 2 wall chargers, mounted, wired and on their own circuit.

Sockets being installed in a wall

Rewiring

Knob and tube out, grounded outlets in, patched as we go.

How a panel upgrade runs

  1. 1

    Site visit

    We check the panel, the meter and your plans for the next ten years.

  2. 2

    Permit and utility

    We file with the city and schedule the power cut with SMUD.

  3. 3

    One day of work

    Power is off for about six hours. We relabel every circuit before we leave.

  4. 4

    Inspection

    We meet the inspector, so you do not have to take a day off.

Plugging in a car next month?

Book the site visit now. Panel work is booked about two weeks out.

Book a site visit

Describe the job

We reply with a price range the same day.

Mon-Fri 7am-5pm

Preview only. This goes live when your site launches.